GC2 GoControl Panel - Power Cycle/Reboot

This brief video demonstrates how to power cycle/reboot your 2GIG GoControl 2 panel:

 

Step-by-Step Instructions:

1. Disarm with Master or User Code, then unplug power supply

GC_Transformer_2.jpg

 

2. Remove screw on top of GoControl and pry open slots with screwdriver

2GIG_GC2_Screw_Top.jpg

 

3. Gently pull the front cover down and hang from plastic strap on the backplate

GC2_Hang_From_Strap.jpg

 

4. Unplug the battery cable from the circuit board, and wait for at least 2 minutes before plugging it back in.

GC2_Replace_Battery.jpg

 

5. Reassemble the touchscreen and plug in the power supply.

GoControl_Small.jpg

Was this article helpful?
1 out of 3 found this helpful